Carhartt® 75L Heavy Haul Duffel
$234.81
Quantity: 1
Production Time: 5 Business Days from Artwork Approval
Product Description
This heavy-duty duffel is built with four ways to carry it—so go ahead and drag, lift or slide it from one job to the next.
- 700D canvas nylon
- Rain Defender® durable water repellent (DWR)
- Coated fabric in key wear zones
- Large main compartment with stretch-mesh pockets
- 4-way carry: backpack straps, duffel straps with keeper, grab-and-go top handles and oversized heavy-duty webbing side handles
- Exterior side-zippered cargo pockets with weather protection flaps
- Side-access, collapsible interior boot or dirty clothes pocket
- Ergonomic padded shoulder straps can be unbuckled and stowed
- Two front flap pockets with hook and loop closure
- Exterior back zippered pocket
- Glove-friendly buckles
- Carhartt label sewn on front
- Dimensions: 11"h x 28.5"w x 12.5"d
- Capacity: 3,919.8 cu. in./75 L
- Weight: 3 lbs. 11 oz./1,678 g
Quantity
Logo Branding
Clifford Power Logo:
Each product includes the Clifford Power logo based on Clifford Power's brand standards.
Generac & Clifford Power Co-Branding:
The Generac logo can be added to your apparel and hat orders by selecting that option in the product menu dropdown. The additional embroidery fee for the Generac add on is $10.00 per item.
Setup Fee/Imprint Fee
$10.00
Shipping Details
Final Cost: Standard shipping rate based on zip code.
Qty/Carton: 16 pcs
Weight/Carton: 24 lbs
Carton/Dimensions: 19L" x 16W" x 10H"
Drop Ship Fee: Domestic - $6.00 | International - $12.50
GForce Fast ShipTerms
What is GFORCE Fast Ship?:
We know a thing or two about rush service.
We've offered rush productions as an optional
upcharge for nearly two decades. We've built
on that experience to now offer dependable,
and FREE, 24 hour rush production service on
a number of our most popular products.
GForce Ship:
-
- Available on all in-stock items displaying the GForce Fast label
- Order and artwork must be emailed to nxtbarbara@gforcebrandsolutions.com
- All orders must reference GForce Fast ship service
- Production timeline begins at proof approval
- Order and vector artwork must be submitted by 10:00 a.m. CST
- Art proof must be approved by 2:00pm CST
- Logo will be sized to fit standard imprint position and area
- Must confirm stock availability Barbara
- Quantities not to exceed 100 pieces
- No Less-Than-Minimum (LTM) quantities
- Maximum of two drop ship locations per order
- UPS and FedEx recommended shipping carriers
- Incomplete order information will result in delays
- Contact us for additional information





















